Device integrations
Sinexcel DC charger
Supported devices: Sinexcel CE 160kW, CE 240kW, UL 240kW and the integrated and distributed DC chargers
Our EMS integrates with the Sinexcel DC charger range over Modbus-TCP. The integration allows charging sessions to be monitored and the charging power to be managed for use cases such as smart charging and load balancing.
This manual assumes the charger has already been physically installed and commissioned. After these steps, the charger is ready for connection to our EMS.
Supported devices
We support the Sinexcel DC charger range, addressed through a single Modbus-TCP integration:
- CE 160 kW
- CE 240 kW
- UL 240 kW
- Integrated DC Charger (compatible firmware)
- Distributed DC Charger (compatible firmware)
In the platform you can either select a specific model or select the series as a whole. The connection and control are identical; the charger reports its own model over Modbus.
EMS functionality
With the current integration, our EMS enables:
- Monitoring of charging state, output power, voltage, current and metered energy per connector
- Per-connector power limiting (connector 1 and connector 2)
- Load balancing within the limit of the grid connection, together with the battery and PV
- Charging at the cheapest moments, including during negative prices
Additional functionality may be added over time as integration capabilities evolve.
Monitoring and per-connector power limiting are documented for connector 1 and connector 2 only. Whole-charger power limiting requires a CCU version higher than 00.102.76. Distributed chargers additionally require an M2 board firmware higher than 104.38 (boards without LAN port) or 200.36 (boards with LAN port).
Configuring the charger
Enable Modbus on the MCU
- On the charger screen, enter the password (default
080808). - Go to Debug → Previous → Debug.
- Select Debug address 5 and enter the value 416.
- The message open modbus appears on the screen.
- Reboot the MCU to apply the change.
Entering
416again at the same place toggles Modbus off (close modbus). A reboot of the MCU is always required after enabling or disabling Modbus.- On the charger screen, enter the password (default
Note the IP address
- Enter the password (default
080808) and go to Setting → MCU. - Note the charger's IP address shown on the screen. Use a fixed IP address for the location.
- The Modbus-TCP port is 502.
- Enter the password (default
Set the model and serial number (optional)
- Go to Setting → MCU → Feature → model to set the charger model (for example
1160for CE 160 kW,1240for CE 240 kW,2240for UL 240 kW). - Go to Setting → MCU → Feature → SN to set the charger number.
- Go to Setting → MCU → Feature → model to set the charger model (for example
Connect to the EMS
- Connect the charger to the same wired network (LAN) as the Voltmaster Controller, on the same subnet.
- Verify that the controller can reach the charger's IP address.
- Add the charger in the platform, selecting brand Sinexcel and the matching DC charger model.
The charger is now successfully configured and ready for use with the EMS.
If a power limit was set over Modbus and Modbus is later disabled, the last configured power limit stays active. Before disabling Modbus, set the power limit back to the charger's nominal power to restore full power.