Voltmasters documentation
Technical documentation for installers: platform, control algorithms, device integrations, DSO RTU and external signals.
Welcome to the Voltmasters EMS documentation. It covers everything you need to set up and follow up a project with EMS control: installing the controller, connecting devices, using the platform and understanding how the control algorithms decide.
Topics
Getting startedMount and connect the controller, create a project, and add and verify devices. Voltmasters PlatformDashboards, device management, incidents, project settings and the Vic AI assistant. Control algorithmsHow the EMS decides: cost optimization, self-supply, grid power target, peak shaving and EV charging. Device integrationsSupported batteries, PV inverters, energy meters, EV chargers and other devices, with the settings per brand. DSO RTURemote control by the grid operator: how it works, connecting the RTU and IO extension, commissioning and certification. MicrogridKeep a site powered during a grid outage: battery island, generator and controlled reconnection. External signalControl by an external partner, such as an aggregator or an energy supplier.Product information
Looking for product pages, use cases or a commercial contact? Visit the Voltmasters website at voltmasters.io.
Need help?
If you encounter issues or have questions that are not covered in this documentation, contact Voltmasters support at help@voltmasters.be or your technical point of contact.