# Blitz Power Station

> Supported devices: Blitz Power Station (BPS), steered per charging point on charging current over Modbus TCP, with a fallback current when communication is lost.

Source: https://voltmasters.io/en/docs/device-integrations/ev-chargers/blitz/

Our EMS steers the Blitz **Power Station (BPS)** over **Modbus TCP**. The station runs on a Phoenix Contact **CHARX** charge controller. One device in the platform covers every charging point of the station, and the EMS limits the charging current of each point together with the rest of the site, within the limit of the grid connection.

> **Note**
>
> The Power Station is available from EMS controller version **0.0.341**.

## Supported devices

| Model | Current type | Connectors |
| --- | --- | --- |
| Power Station (BPS) | AC | Reported by the station |

The station reports how many charging points it has. The EMS creates one connector per charging point.

## How the integration works

-   **Charging current control**: each charging point is steered through its maximum charging current. The EMS converts its setpoint over the phases the session draws, rounds it down, and keeps it between 6 A (the lowest value the station accepts) and the maximum of the charging point.
-   **Pause and resume**: a pause writes 0 A, which withdraws the charging release of the charging point. While the pause holds and the car stays plugged in, the connector shows as suspended by the charger. Resuming needs no new authorisation.
-   **Load balancing**: the station takes part in the site load management per connector. The **Load balancing mode** only offers **Per connector**.
-   **Monitoring**: charging state, voltage, current and power per phase and the session energy are read back per charging point and shown on the device page and in the EV charging dashboard.
-   **Incidents**: a charging point that keeps offering more current than its limit for 30 seconds, a station that keeps its own limit, and a charging point whose data stops refreshing while a car is connected are raised as incidents.

## Setup

1. **Network**
   
   Connect the station to the same network as the Voltmasters Controller and give it a fixed IP address. Make sure the controller can reach it over Modbus TCP on port `502`.
2. **Hand the load management to the EMS**
   
   In the Blitz web interface (port `3000`), set the load management to **External EMS** with **Other EMS**. In its own dynamic mode the station rewrites the charging current every 30 seconds, so it does not follow the EMS and the EMS raises an incident.
3. **Add the station in the platform**
   
   Add a device of type **EV charger**, with brand **Blitz** and model **Power Station (BPS)**. Fill in the IP address, port `502`, and check the prefilled **Slave ID** `1`. The connection test reads the number of charging points from the station and prefills the connectors.
4. **Verify**
   
   Start a charging session and check on the device page that the charging state and power come in, and that the charging point follows a lowered limit.

> **Warning**
>
> **Protection of the load circuit**
> 
> When the station's own load management is switched off, it no longer protects the load circuit it supervises. Make sure that protection is covered on site before the station runs on the EMS.

> **Note**
>
> **Fallback on a lost connection**
> 
> While the EMS steers the station, it keeps the watchdog of every charging point alive. When the station hears nothing from the EMS for 60 seconds, each charging point falls back to 6 A until the EMS takes over again.